Considerations To Know About site acceptance test (sat)
This involves assessments like strain tests for plumbing or load tests for structural things to confirm operational demands are achieved. Testing happens at numerous building phases, systematically determining and rectifying possible issues early. Push the INIT button on the first controller (controller having sign on controller entrance panel)P